Wall #2

new fire hall under construction ©johncameron.ca

A photo of two brick panels on the exterior of Saanich Fire Station No.2 (under construction) on the corner of Elk Lake Drive and Royal Oak Drive.

The old building (3,800 sq. ft.) was taken down and construction on the new building (23, 476 sq. ft.) has been delayed and is currently over budget.

(https://saanichnews.com/2025/10/29/new-saanich-fire-hall-mired-in-delays-and-cost-overruns/)


Technical: Canon EOS R5 , ISO 1600, 1/2500 sec, f/10, Canon RF 100-400mm, handheld at a focal length of 270mm


By